Baseball Stadium
Construction Pictures as of
2/22/2008
Picture Index |
|
|
|
 |
|
Laying block at the
northwest stadium entrance near the home team
clubhouse |
|
|
|
 |
|
The field is being
excavated down another two feet before
installing the drainage system and sod for the
playing area - the outfield wall will be padded! |
|
|
 |
|
The pressbox exterior in
now pretty much completed |
|
 |
|
It's not for cooking
burgers! They are fabricating a steel form
to pour the footings for the outfield light
poles |
|
|
 |
|
No more plywood and plastic
- we've got real glass windows now! |
|
|
|
 |
|
I think the Boys had better
look at the plans again, the specs call for a 2
foot high pitcher's mound, not one 20 feet
high!!! |
|