 |
| |
|
Baseball Stadium
Construction Pictures as of
4/18/2008
Picture Index |
|
|
|
 |
|
A lot of core drilling
going on to install the seating area railings. |
|
|
|
 |
|
The infield is now red, it
won't be long until the rest of the brown turns
green! |
|
|
 |
|
This is the main entrance
where the wall plaques and donor bricks will be
placed. |
|
|
 |
|
Much of the concrete
concourse area has been poured! |
|
|
 |
|
Pulling wire through the
conduit of one of the many electrical boxes. |
|
|
Previous
Next |