Baseball Stadium

Construction Pictures as of 4/4/2008                             Picture Index

 

The concrete concourse is formed and ready to be poured between the administration building and the press box!


 

The old chain link fence along N 27th Street is coming down.


 

The ticket windows should last a little longer than the old plywood ticket booths - they look a little better too!


 

All of the stairway railings for the seating area are installed - the warning track now encircles the entire field area.


 

The stairway in the center of the picture leads up to the winning team clubhouse!


 


Previous        Next


     About Us | Site Map | Contact Us | Disclaimer | Privacy Policy
     © copyright City of Billings 2011 - all rights reserved