Baseball Stadium

Construction Pictures as of 5/2/2008                             Picture Index

 

We've got a HOMEPLATE! 


 

And pretty soon we'll have SEATS!  All of the hundreds of anchor bolts have been installed in the concrete.


 

All is ready with the irrigation system to water the sod after it is placed next week!


 

The concrete driveway leading into the maintenance garage area has been poured.


 

Work continues on the exterior sidewalks and front entrance plaza.


 


Previous      Next


     About Us | Site Map | Contact Us | Disclaimer | Privacy Policy
     © copyright crytech 2007 - all rights reserved